In most cases the paint has to come off before a driveway is resurfaced. A spray-on overlay bonds to concrete, not to a paint film, and one widely sold resurfacing system’s data sheet says the concrete must be “clean and free of grease, oil, paint or any curing agent” before it is primed (Dulux Avista Base Compound data sheet). The real questions are how the paint is removed safely, what turns up underneath, and what the data sheet of the chosen system allows.
Why an overlay and old paint do not mix
An overlay can only hold as well as whatever it is stuck to. On a painted driveway that is the paint, and paint that is already peeling at the edges or flaking in the wheel tracks has shown it is losing its grip. Paint that still looks sound in one spot may be letting go nearby, so a contractor looking at a painted driveway will usually test it in several places, including the parts that look fine.
Resin coatings are no different. A polyaspartic floor coating data sheet, for example, asks for removal of “existing coatings” and preparation by grinding, shot blasting, scarifying, ultra high-pressure water jetting or scabbling before it goes on (Hychem PA330 data sheet). Whatever system is quoted, ask to see its preparation section: if it says the surface must be free of paint, an “overlay straight over the top” quote does not follow the maker’s instructions.
Is it paint or an old sealer?
Paint is usually opaque and hides the concrete’s texture and colour variation. A clear or lightly tinted sealer lets the concrete show through and tends to wear dull rather than peel in sheets. The difference matters: a worn acrylic sealer can often be cleaned and resealed, which is a grinding and sealing job, while a failing paint film generally has to be removed. A contractor can confirm which it is by testing a small patch.
How the paint comes off, safely
Paint is usually removed mechanically, most often by diamond grinding, which also opens the concrete surface for the new coat. The guide to removing old paint and stains compares the methods. Three hazards come with it:
- Silica dust. Grinding and cutting concrete creates crystalline silica dust. SafeWork NSW requires the business to assess the risk in writing and to control the dust, for example with wet methods or on-tool extraction (SafeWork NSW).
- Old lead paint. The NSW Government’s LeadSmart guidance says lead paint was used in most homes built in Australia before 1970, that the danger rises when old paint is removed, and that wet sanding and wet scraping are the safest preparation methods; it warns against open-flame torches (NSW Government, LeadSmart: renovating and maintenance). If the driveway paint is old, ask whether it will be tested for lead before any grinding.
- Slurry and flakes. Paint chips and grinding slurry must not be washed into the gutter or stormwater; only rain should go down the drain (NSW EPA, The drain is just for rain). Ask how waste will be collected and where it goes.
What grinding can reveal
Driveways are sometimes painted to hide stains, patches or cracks, and those show up once the paint is off. The bare concrete may also look patchy, which an overlay covers. Cracks are different: the same overlay data sheet notes that cracks in the concrete base may reflect through the new surface, and that future movement can cause chipping. The guide to cracks before resurfacing explains which cracks need repair first. A good quote says how extra repairs found after grinding will be priced before they go ahead.
After the paint is off: overlay, seal or repaint
- Overlay if the surface is damaged, patchy or needs a new look; see driveway resurfacing.
- Grind and seal if the bare concrete is sound and its look is acceptable.
- Repaint only with a product made for trafficked concrete, applied to its maker’s preparation instructions.
No publisher prices paint removal on its own. Grinding is labour-heavy, so the area, the paint’s thickness and any lead precautions drive the cost; the cost breakdown lists the published resurfacing ranges.
Frequently asked questions
Can an overlay go straight over old driveway paint?
Not for systems whose data sheet requires concrete free of paint, as Dulux Avista’s resurfacing system does (Dulux Avista). Ask the contractor to show the preparation section for the system they are quoting.
Should I just repaint it myself?
A new coat over paint that is already lifting adds another layer with the same weak bond underneath. If the old paint may be lead-based, NSW LeadSmart guidance favours wet scraping or wet sanding over dry methods and warns against open flames.
Is grinding paint off noisy and dusty?
It is noisy, and it creates silica dust that NSW rules require the contractor to control, for example with wet methods or on-tool extraction (SafeWork NSW). Ask how dust and slurry will be handled.
Sources
- Dulux Avista, Base Compound technical data sheet (PDF): preparation requirement that concrete be free of paint, and crack notes, for one resurfacing system, checked 15/11/2026
- Hychem, PA330 technical data sheet (PDF): removal of existing coatings before one polyaspartic coating, checked 15/11/2026
- NSW Government, LeadSmart: renovating and maintenance: lead paint in pre-1970 homes and safer removal methods, checked 15/11/2026
- SafeWork NSW, Work safely with crystalline silica: silica dust controls, checked 15/11/2026
- NSW EPA, The drain is just for rain: stormwater pollution, checked 15/11/2026