Preparing a driveway for resurfacing is mostly the contractor’s job: cleaning off oil and old coatings, repairing cracks, opening up the surface so the new material can grip, and letting it dry. The owner’s part is to clear the driveway, flag any known problems, and check that the quote spells out each preparation step. Preparation is where the bond between old concrete and new surface is made or lost, so it deserves the closest look on any quote.
What the owner does
- Clear the area. Vehicles, bins, pot plants, furniture and anything stored along the edges, for the whole job and the drying time after it.
- Tell the contractor what you know. Where oil has dripped, whether the driveway has been painted or sealed before and with what, where water ponds, and whether any cracks have widened recently.
- Check the slab’s age and warranty. One overlay maker asks for concrete cured for 14 to 30 days depending on conditions before coating (Dulux Avista Base Compound technical data sheet). On a newer home, NSW statutory warranties run six years for major defects and two years for other defects from completion (NSW Government, Contracts); the guide to driveways still under builder warranty covers what to check first.
- Find out who owns the crossing. The strip between the boundary and the road is council land, and Port Stephens Council requires approval before any work there (Works in the road reserve).
Leave grinding, acid washing and stripping to the contractor. They involve silica dust, chemicals and slurry that NSW rules require to be controlled.
What the contractor’s preparation involves
The order varies between products and contractors. As a published reference, Dulux Avista’s data sheet for its Base Compound overlay sets out this sequence (technical data sheet):
- Repair cracks, while warning that “future movement in the concrete may cause cracks to appear” through the new surface.
- Clean so the concrete is “free of grease, oil, paint or any curing agent”, using a stiff broom and cleaner.
- Pressure clean at a minimum of 2000 psi and let it dry.
- Acid etch with diluted hydrochloric acid to remove loose cement and laitance, then pressure clean again straight away, without letting acid dry on the surface.
- Mask grass, plants and surrounding surfaces, and tape expansion joints.
- Prime, without letting primer pool, because primer dried in a puddle “can affect adhesion”.
Other systems swap acid etching for mechanical grinding, especially where old sealer, paint or deep oil has to come off; the maker’s sealer data sheet says sealer should not go over painted surfaces and “Paint removal required” (Avista General Purpose Concrete Sealer technical data sheet). Whichever method is used, ask for it on the quote along with the product’s data sheet. Grinding and sealing covers the grinding side.
Cracks and movement come first
Fine, stable cracks are filled and covered. Cracks that are wide, stepped or still moving are a sign the slab itself needs attention, and no amount of surface preparation stops them reflecting through. The guide to repairing cracks before resurfacing explains the difference, and where sections have sunk on sandy ground, see driveway subsidence in sandy soils.
Dust, acid and slurry
Grinding and cutting concrete creates crystalline silica dust. SafeWork NSW requires the business to assess the risk in writing and control it, for example with wet dust suppression or on-tool extraction (SafeWork NSW). Acid rinse, slurry and dirty wash water must not reach the gutter: stormwater in NSW flows to creeks and rivers “untreated and unfiltered” (NSW EPA, The drain is just for rain), and the state’s building site guidance says wash-down and cutting areas must be managed so sediment and hazardous materials do not enter the stormwater drain (NSW Planning Portal, Erosion and sediment control factsheet). Ask the contractor how they will contain and dispose of it.
Dry before coating
Coatings applied to damp concrete can fail. The sealer data sheet above says “sealing over damp concrete will cause whitening” and checks readiness by taping a plastic sheet down over a patch of concrete: any moisture on the plastic or the concrete when it is lifted means wait. The overlay sheet uses the same test over one hour before sealing. After rain, or on a shaded section, that can mean waiting, which is a reason to accept a weather delay rather than push for a fixed date. The driveway resurfacing page covers the job as a whole.
Frequently asked questions
How long does preparation take?
It depends on the area, the stains, old coatings and the drying time the weather allows, so no general figure holds. Ask the contractor to say on the quote which steps they will do and how many visits they expect.
Can I do some of the preparation myself?
Clearing the driveway and a general sweep help. Pressure cleaning at the pressures data sheets call for, acid etching and grinding are best left to the contractor, who must control dust and slurry under NSW rules.
Will a fresh oil stain affect the resurfacing?
It can. Data sheets call for concrete free of oil before coating, so point out every stain, old or new, when the contractor inspects.
Sources
- Dulux Avista, Base Compound technical data sheet (PDF): curing age, preparation sequence, primer and dry test for one overlay, checked 15/11/2026
- Avista General Purpose Concrete Sealer technical data sheet (PDF): paint removal, damp-surface whitening and dry test for one sealer (April 2018), checked 15/11/2026
- NSW Government, Contracts for residential building work: statutory warranty periods, checked 15/11/2026
- Port Stephens Council, Works in the road reserve: approval for work on council land, checked 15/11/2026
- SafeWork NSW, Work safely with crystalline silica: written risk assessment and dust controls, checked 15/11/2026
- NSW EPA, The drain is just for rain: stormwater is untreated, checked 15/11/2026
- NSW Planning Portal, Erosion and sediment control factsheet (PDF): wash-down and cutting areas kept out of the stormwater (April 2026), checked 15/11/2026